Building Performance Contractors
The Testing Process Typically Includes
- A safety and efficiency check of the heating and hot water equipment including testing for carbon monoxide and flue backdrafting
- Testing of building air leakage rates using a "blower door"
- Testing of duct leakage rates and the interaction between the duct system and the building
- Identification of air and duct leakage sites and connections between building components using a digital manometer
- Testing of humidity levels
- Identification of moisture sources
- Identification of existing insulation levels
- A review of occupant problems and concerns


